Working with Certain QMS

How a Certain QMS implementation runs

A structured implementation with named phases and a decision you control at the end of each one. The work centres on your documents, processes and roles, so the plan follows your scope. Hospitals, municipalities, energy and telecoms companies run Certain QMS today.

Colleagues discussing a Certain QMS implementation

A rollout, not a software install

Taking a quality management system into use changes how documents are controlled, how deviations are followed up, and how risk and audits are owned. It moves existing documents and process maps into a new system. It connects to Microsoft 365, SharePoint and the identity system people already sign in with.

So we run it as a short programme. Each phase has an objective and a decision. At the decision we present what we produced, and you decide whether the work moves on. Nothing goes live because a date has arrived.

You own the gates

Every phase ends with a decision. We present the deliverables; you accept them, or send them back with what is missing.

One team from start to finish

The same implementation team stays with you through discovery, configuration, training and follow-up. Product and quality specialists are both available.

Scope drives the plan

The modules you start with, the state of your documents and the integrations you need set the timeline. We estimate against your scope, not a template.

The implementation model

Five phases, five decisions

The activities below are typical. Detail is agreed with you in phase 1.

Phase 1

Kick-off and as-is

Put the plan in place and understand how you work today, before anything is configured.

  • Confirm which modules, sites and user groups are in scope
  • Name the project manager and process owner on both sides
  • Map today’s documents, deviations, risk and audit work
  • List data sources and integrations — Microsoft 365, SharePoint, identity

Decision. You accept the plan. Nothing is configured before you do.

Phase 2

Solution design

Agree in writing how Certain QMS will work for you.

  • Workshops on workflows, roles, document structure and categories
  • Agree what migrates and what is left in the old system
  • Agree the tests we will run before go-live

Decision. You sign the design. Later change goes through a change request.

Phase 3

Configuration, integrations and data

Build the agreed design, connect it, and load a trial of your data.

  • Configure workflows, roles and document structure
  • Single sign-on against Azure AD / Entra ID, and SharePoint where agreed
  • Trial load of documents and open cases until you accept the numbers

Decision. A trial load you accept, and integrations shown in test.

Phase 4

Training, acceptance and go-live

Prove the system does what the design said, then take it into use.

  • Administrators and superusers trained first, so they can take part in testing
  • Your people run acceptance on your data
  • Go-live when the criteria are met — for more than one site, one site first

Decision. You accept the system. Open critical defects block go-live.

Phase 5

Hypercare and handover

Stabilise daily use, then hand the system to the people who will run it.

  • Higher availability and structured follow-up for a short period after go-live
  • A named system owner and administrator on your side
  • Support agreement in effect, with an improvement backlog into the run phase

Decision. You exit hypercare when the system is stable, not on a fixed date.

Your side of the table

What the implementation asks of you

The plan depends on decisions only you can make, and on documents only you hold. Naming these roles late is the most common reason an implementation slips.

Sponsor

Owns the business case and resolves deadlocks that cross quality, EHS and IT.

Quality or process owner

Decides how documents, deviations, risk and audits should work. Signs the design.

Superusers

Test the system, train colleagues, and stay the first line of help after go-live.

IT counterpart

Identity, SharePoint and any other interface. Best engaged in phase 1, not the week before go-live.

Documents are the hard part

Quality documents live in many places: file shares, SharePoint libraries, old systems and mailboxes. A migration that copies that forward gives you a faster version of the same problem. We inventory the sources, run a trial load, and you decide what migrates, what is archived and what is rewritten in Certain QMS.

It has to fit the systems you already run

Most Certain QMS customers already work in Microsoft 365. We map SharePoint and identity in phase 1 and specify each interface in phase 2, before anything is built. Other systems are handled the same way: we will not commit to an integration before we have seen the interface.

Netpower Business Solutions AS is certified to ISO 27001. Certain QMS is hosted in Netpower’s own data centre in Sandnes. Access is role-based; users sign in with the account they already have.

Talk to the people who would run your implementation

See Certain QMS working, or go straight to scope, documents, integrations and timeline.